This Holland Villas Road project comprised of very large three level basement. The piling consisted of 600mm diameter piles with interlocking 600mm diameter piles to form a secant piled wall. The ground conditions in Holland Villas are some of the most challenging we have ever encountered where there is a mix of gravel layers and sand layers making the piling extra difficult.